Way back, before Programmable Logic Controllers (PLCs) became the norm, plant floor automation was performed with racks and racks of industrial relays, pneumatic plunger timers, and electromagnetically counters to control the starting and stopping of motors, opening of valves, and other control-related process interactions. The program that ran the control for such a setup was not a program at all but a combination of interconnected circuits, timers, and relays. By forming the electrical paths, physical actions such as opening valves, running motors, and turning on lights were accomplished. The programmer of a relay system like this was the plant floor electrical engineer and program changes involved physically changing the electrical circuits. There was no programmer's Terminal or interface to connect to and there weren&apos...
Germany
Slovakia
Canada
Brazil
Singapore
Hungary
Philippines
Mexico
Thailand
Ukraine
Luxembourg
Estonia
Lithuania
Norway
Chile
United States
Great Britain
India
Spain
South Korea
Ecuador
Colombia
Taiwan
Switzerland
Indonesia
Cyprus
Denmark
Finland
Poland
Malta
Czechia
New Zealand
Austria
Turkey
France
Sweden
Italy
Egypt
Belgium
Portugal
Slovenia
Ireland
Romania
Greece
Argentina
Malaysia
South Africa
Netherlands
Bulgaria
Latvia
Australia
Japan
Russia