Search icon CANCEL
Subscription
0
Cart icon
Your Cart (0 item)
Close icon
You have no products in your basket yet
Arrow left icon
Explore Products
Best Sellers
New Releases
Books
Videos
Audiobooks
Learning Hub
Free Learning
Arrow right icon
Arrow up icon
GO TO TOP
Agile Model-Based Systems Engineering Cookbook

You're reading from   Agile Model-Based Systems Engineering Cookbook Improve system development by applying proven recipes for effective agile systems engineering

Arrow left icon
Product type Paperback
Published in Mar 2021
Publisher Packt
ISBN-13 9781838985837
Length 646 pages
Edition 1st Edition
Languages
Concepts
Arrow right icon
Author (1):
Arrow left icon
Dr. Bruce Powel Douglass Dr. Bruce Powel Douglass
Author Profile Icon Dr. Bruce Powel Douglass
Dr. Bruce Powel Douglass
Arrow right icon
View More author details
Toc

Table of Contents (8) Chapters Close

Preface 1. Chapter 1: The Basics of Agile Systems Modeling 2. Chapter 2: System Specification FREE CHAPTER 3. Chapter 3: Developing System Architectures 4. Chapter 4: Handoff to Downstream Engineering 5. Chapter 5: Demonstration of Meeting Needs: Verification and Validation 6. Other Books You May Enjoy Appendix A – The Pegasus Bike Trainer

Iteration 0

Iteration 0 refers to the work done before incremental development begins. This includes early product planning, getting the development team started up, setting up their physical and tooling environment, and making an initial architectural definition. All of this work is preliminary and most of it is expected to evolve over time as the project proceeds.

Purpose

The purpose of iteration 0 is to pave the way for the successful launch and, ultimately, the completion of the product.

Inputs and preconditions

The only inputs are the initial product and project concepts.

Outputs and post conditions

By the end of iteration 0, initial plans are in place and all that they imply for the product vision, the product roadmap, the release plan, and the risk management plan. This means that there is an initial product backlog developed by the end of iteration 0, at least enough that the next few iterations are scoped out. Iterations further out may be more loosely...

lock icon The rest of the chapter is locked
Register for a free Packt account to unlock a world of extra content!
A free Packt account unlocks extra newsletters, articles, discounted offers, and much more. Start advancing your knowledge today.
Unlock this book and the full library FREE for 7 days
Get unlimited access to 7000+ expert-authored eBooks and videos courses covering every tech area you can think of
Renews at $19.99/month. Cancel anytime
Banner background image